Summary of Topics s723_11_sum.htmlSummary of Topics
This revision of ANSI/UL 723 dated June 23, 2025 includes the following changes in requirements:
– Test Specimen: 4.1
– Scope Expansion to Include Plastic Water Distribution Plumbing Pipe: 1.2A
– Calibration of Test Equipment – Removal of Red Oak for Smoke Calibration: 5.9, 5.11, Figure 5.2, Figure 5.3, Figure 5.4 (deleted), 5.12, Figure 5.5, 5.13, 5.19A, 5.21 – 5.23 (deleted), 7.1.6
– Appendix – Wire and Cables: Section A10 (deleted)