Summary of Topics s1709_6_sum.htmlSummary of Topics
This revision of ANSI/UL 1709 dated July 8, 2024 includes the following changes in requirements:
– Fire Test Procedures for Passive Fire Protection Systems for Critical Process Control Equipment (CPCE); Part 3, Section 18 – 24, and Annex C – Annex E
– Fire Resistance Rating Procedures for Hollow Section Column Tests with Reactive Materials; 8.5 – 8.7, 16.5A, Section A5