Standard 325, Edition 7
UL 325

ANSI/CAN/UL Standard for Door, Drapery, Gate, Louver, and Window Operators and Systems

UL CSDS Proposal Edition 7 Published Date: July 06, 2018 Last Revision: February 21, 2023

Summary of Topics b0325_7_20180706_sum.html

Subject 325

Bulletin Dated: July 6, 2018

SUMMARY OF TOPICS

The following changes in requirements to the Standard for Door, Drapery, Gate, Louver, and Window Operators and Systems, UL 325, are being proposed:

1. Change to Introduction Scope

2. Direct Plug-In Devices

3. Removing Type AF and CF Wiring, and Editorial Revision to 15.1.5

4. Proposal for Button Battery Requirements to be Included in UL 325, Reference to Horizontal Standard, UL 4200A

5. Constant Pressure Override Capability for Gate Operators Using Portable Wireless Controls

6. Barrier Arm Manual Release Exception

7. Barrier Arm Pendulum Support

8. Outdoor Use Clarification of Edge Sensor Testing

9. Requirements for Lasers

10. Swing Gate Entrapment Zone Definition and Instruction

11. Edge Sensor Endurance Test Force Clarification

Back to Standard 325, Edition 7

The cost to purchase this Standard varies depending on whether you are ordering a hardcopy, PDF or combination of the two. We also offer two different types of subscriptions: a one year and a three year.

You will be able to choose your purchase options on the following pages.

×
×
×
×
×

You have one or more subscriptions that will expire soon.

×

You have one or more licenses to assign

×

Additional information required

To serve you better, please update your account details.

Featured Standards


Recently Published











Coming Soon

UL 48
Electrical Signs
Revision Pages

UL/ULC 25
Meters for Flammable and Combustible Liquids and LP-Gas
Revision Pages

UL 155
Tests for Fire Resistance of Vault and File Room Doors
Revision Pages

UL 310
Electrical Quick-Connect Terminals
New Edition

UL 19
Lined Fire Hose and Hose Assemblies
Revision Pages

UL 104
Elevator Door Locking Devices and Door or Gate Closed Detection Means
New Edition

UL 217
Smoke Alarms
Revision Pages

UL 294
Access Control System Units
Revision Pages
×

Email Verification Required

To enhance security and protect our community from fraudulent activity, we require email address confirmation before orders can be placed. This step ensures that all orders come from verified sources, helping us maintain a safe and trusted environment for everyone. Thank you for your cooperation.

To resend the confirmation email please click here. The confirmation email will look like the sample below.

Sample

example email
×