Standard 1450, Edition 4
UL 1450

Standard for Motor-Operated Air Compressors, Vacuum Pumps, and Painting Equipment

UL CSDS Proposal Edition 4 Published Date: March 23, 2018 Last Revision: May 27, 2021

Summary of Topics b1450_4_20180323_sum.html

Subject 1450

Bulletin Dated: March 23, 2018

SUMMARY OF TOPICS

The following changes in requirements to the Standard for Motor-Operated Air Compressors, Vacuum Pumps, and Painting Equipment, UL 1450, are being proposed:

1. Item For Consideration: Single Insulating Wiring

2. For Preliminary Review Only: Proposed Addition Of Paragraph 2.20.1 To Define A Portable Product

3. For Preliminary Review Only: Proposed Addition Of Requirements To Allow A Minimum HB Flammability Rating For Class 2 LPS Or LVLE Circuits

4. For Preliminary Review Only: Proposed Revision To Paragraph 9.5 To Remove UV Requirements For Indoor Equipment And To Clarify Test Tolerances

5. Proposed Revision To Paragraph 17.1.2 To Reference The Correct Requirements In Section 12, Accessibility Of Uninsulated Live Parts and Film-Coated Wire, To Reflect The Intent Of The Requirement

6. For Preliminary Review Only: Proposed Revision To Paragraph 20.1.5 To Clarify Grounding Requirements For Dead Metal Parts

7. For Preliminary Review Only: Proposed Revisions To Table 46.1, Temperature Rises, To Add Insulation Classes H, N And R And Clarify The Requirements

8. For Preliminary Review Only: Proposed Revisions To Paragraph 46.2.2 To Allow The Use Of Oil When Testing Non-pneumatic Paint Sprayers

9. For Preliminary Review Only: Proposed Revisions To Paragraph 47.2 To Clarify The Test Method For Grounding Continuity

10. For Preliminary Review Only: Proposed Revision To 54.1 To Clarify The Test Method For The Abnormal Test With Respect To Semiconductor Junctions

11. For Preliminary Review Only: Proposed Revision To Paragraph 58.1 To Allow Oil Or Other Representative Liquid For The Hydrostatic Strength Test

12. For Preliminary Review Only: Proposed Revisions To Clarify Construction And Performance Requirements For Battery-Operated Products With Respect To Battery Ratings And Types

13. For Preliminary Review Only: Proposed Revisions to Table SA6.1 To Delete Obsolete Properties And To Align With Similar Requirements In The Standard For Tests For Sharpness Of Edges On Equipment, UL 1439

14. For Preliminary Review Only: Proposed Revisions To Test Requirements In Section SA9, Gasket And Seals, To Exempt Gaskets Not Relied Upon To Reduce Risk Of Electric Shock Or Injury To Persons From Testing

15. For Preliminary Review Only: Proposed Revision To Paragraph SA10.11 To Add 50/50 Ethylene Glycol/Water Mix As An Acceptable Solvent That Can Be Used In The Solvent Exposure Test - Tensile Strength And Elongation Tests

16. For Preliminary Review Only: Proposed Revisions To Paragraph SA10.12 To Clarify Pull Force Test Requirements For Hoses With Diameters Greater Than 3/16 In.

17. For Preliminary Review Only: Proposed Addition Of Figure SA10.1 To Clarify The Correct Test Method For The Hose Flexing Test

Back to Standard 1450, Edition 4

The cost to purchase this Standard varies depending on whether you are ordering a hardcopy, PDF or combination of the two. We also offer two different types of subscriptions: a one year and a three year.

You will be able to choose your purchase options on the following pages.

×
×
×
×
×

You have one or more subscriptions that will expire soon.

×

You have one or more licenses to assign

×

Additional information required

To serve you better, please update your account details.

Featured Standards


Recently Published











Coming Soon

UL 48
Electrical Signs
Revision Pages

UL/ULC 25
Meters for Flammable and Combustible Liquids and LP-Gas
Revision Pages

UL 155
Tests for Fire Resistance of Vault and File Room Doors
Revision Pages

UL 310
Electrical Quick-Connect Terminals
New Edition

UL 19
Lined Fire Hose and Hose Assemblies
Revision Pages

UL 104
Elevator Door Locking Devices and Door or Gate Closed Detection Means
New Edition

UL 217
Smoke Alarms
Revision Pages

UL 294
Access Control System Units
Revision Pages
×

Email Verification Required

To enhance security and protect our community from fraudulent activity, we require email address confirmation before orders can be placed. This step ensures that all orders come from verified sources, helping us maintain a safe and trusted environment for everyone. Thank you for your cooperation.

To resend the confirmation email please click here. The confirmation email will look like the sample below.

Sample

example email
×