Standard 61800-5-1, Edition 1
UL 61800-5-1

Standard for Adjustable Speed Electrical Power Drive Systems - Part 5-1: Safety Requirements - Electrical, Thermal and Energy

UL Bulletin Edition 1 Published Date: March 31, 2017 Last Revision: February 11, 2021

$259.00-$324.00

Summary of Topics m0508c_4_20170331_sum.html

Subject 508C (61800-5-1, 61800-5-2)

Bulletin Dated: March 31, 2017

SUMMARY OF TOPICS

The following topics were discussed at the meeting of the Standards Technical Panel for Power Conversion Equipment:

1. Update on current projects for the Standard for Power Conversion Equipment, UL 508C

2. Update on current projects for the Standard for Adjustable Speed Electrical Power Drive Systems - Part 5-1: Safety Requirements - Electrical, Thermal and Energy, UL 61800-5-1

3. Update on the Standard for Adjustable Speed Electrical Power Drive Systems - Part 5-2: Safety Requirements - Functional, UL 61800-5-2

4. Update from the Servo Drive Amplifier Task Group

5. Update from the IGBT Task Group and discussion of the following proposal to serve as preliminary review: Use of thermistors to comply with 5.1.5DV

6. Update from the Multiple Motors Task Group and discussion of the following proposal to serve as preliminary review: CDM/BDM controlling multiple motors

7. Update from the Drives with Power and Control Cable Assemblies Task Group

8. Update from the Spacings Task Group and discussion of the following proposal to serve as preliminary review: Clarification of Spacings and Internal Wire Insulation for Rectified AC Voltages

9. Update from the DC Bus Connection Task Group

10. Update from the Drive Tap Conductor Protection Task Group

11. Update from the UL 61800-5-2 Task Group

12. Update from the Test Reduction Task Group

13. Discussion of the following proposal to serve as preliminary review: Revision to the requirements for across-the-line capacitors

14. Discussion of the following proposal to serve as preliminary review: Slash and Straight Voltage Ratings for Drives with a 3 Phase Input

15. Discussion of the following proposal to serve as preliminary review: Control Circuit Transformer Protection

16. Discussion of the following proposal to serve as preliminary review: Signal Words

17. Discussion of the following proposal to serve as preliminary review: Revision to the conductor temperature limit during the Temperature Test, Section 40

18. Discussion of the following proposal to serve as preliminary review: Component Analysis for Breakdown of Components Test

19. Discussion of the following proposal to serve as preliminary review: Dust test requirement for equipment rated other than Type 1, 2, 3R, and 3RX

20. Discussion of the following proposal to serve as preliminary review: Clarification of deflection test prior to clearance measurement

21. New business: UL 484, UL 1998, and IEC 60335

22. New business: UL 1066 Requirements

Back to Standard 61800-5-1, Edition 1

The cost to purchase this Standard varies depending on whether you are ordering a hardcopy, PDF or combination of the two. We also offer two different types of subscriptions: a one year and a three year.

You will be able to choose your purchase options on the following pages.

×
×
×
×
×

You have one or more subscriptions that will expire soon.

×

You have one or more licenses to assign

×

Additional information required

To serve you better, please update your account details.

Featured Standards


Recently Published











Coming Soon

UL 48
Electrical Signs
Revision Pages

UL/ULC 25
Meters for Flammable and Combustible Liquids and LP-Gas
Revision Pages

UL 155
Tests for Fire Resistance of Vault and File Room Doors
Revision Pages

UL 310
Electrical Quick-Connect Terminals
New Edition

UL 19
Lined Fire Hose and Hose Assemblies
Revision Pages

UL 104
Elevator Door Locking Devices and Door or Gate Closed Detection Means
New Edition

UL 217
Smoke Alarms
Revision Pages

UL 294
Access Control System Units
Revision Pages
×

Email Verification Required

To enhance security and protect our community from fraudulent activity, we require email address confirmation before orders can be placed. This step ensures that all orders come from verified sources, helping us maintain a safe and trusted environment for everyone. Thank you for your cooperation.

To resend the confirmation email please click here. The confirmation email will look like the sample below.

Sample

example email
×